Hatch Street

Sonica has been a phenomenal partner to HubSpot – they always keep our interests front-and-centre and are beyond timely and thorough. If you wanted a partner that can do it all and give the attention these complex fitout projects command, it is Sonica Fitout – they simply get it, and get results.

Ken Papa, Facilities Director, Hubspot Inc.

size
  • 2400m/sq
timescale
  • 16 Weeks
features
  • Bespoke Joinery
  • Feature fabric wall panelling
  • Feature ceilings
  • Architecturally integrated M&E
  • WC and Landlord upgrades
  • Commercial Kitchen Facility
  • Full UPS and Generator backup

the work

the story

Our brief was to strip and refit this space over two floors in a busy Dublin City Centre office block; transforming the area into an expansive, sophisticated office for our client’s HQ in Ireland.

The location offered unique challenges as the city-centre building was multi-tenanted with heavy restrictions in place, so the works were carried out on a phased basis over 16 weeks. Our precision logistical & personnel planning, with functional swing spaces, ensured that no interruptions were endured by our Client and business as usual could continue.

Due to the significance of this site for our Client, this project was managed in tandem with an international, client-side design team. The result is a fitout that is truly fit-for-purpose and deserving of its central status. The office features a set of client-facing areas and executive suites with custom joinery bringing consistency and finish throughout. Three open-plan areas unite this workspace, highlighted by feature ceilings and lighting. More intimate breakout areas are included with acoustic ceilings, ensuring privacy and focus can be maintained in these multi-purposeful zones. The area is encapsulated by surrounding cellular offices and meeting rooms featuring unique, custom furniture. The office now boasts a full, commercial-grade kitchen and bright, fresh staff canteen.